5.
Secure Prisons
This
particular aspect looks at two prison projects recently undertaken
by the organisation. One of these was located in North London
and the other in South London. In the case of the former, the
task was to provide coverage to a given area within the prison
coupled with digital recording. In the case of the latter, this
was to provide full perimeter coverage as well as completely
refitting the operation control room. The task in the case of
the north London site involved installation of a total of forty
fixed cameras linked to a dedicated digital recording system
providing thirty-one days cover. The works involved included
the provision of a UPS to drive the system as well as all of
the air conditioning and electrical works required to fit out
the operations room for the control front-end hardware. This
was a short time scale project, which was completed in sixteen
weeks.
In the case of the south London site, this covered the installation
of some forty cameras. There were a mixture of fixed and pan
and tilt as well as a mixture of colour and black and white.
This upgrade had to be implemented in such a manner to maintain
the existing hardware in a fully operational state as the change
was made. This change included not only the change over of the
control equipment, but the complete refitting of the control
room including the console and all of the services.
These services included all of the electrical works, air conditioning
and the full decoration of the room involved. As part of the
package, a new UPS unit was fitted to drive the front-end control
equipment together with a complete replacement of the alarm
indicator panel and the provision of a new radio base station.
In both cases, the projects presented challenges of one kind
or another. In the case of the former one, the virtue of time
and in the case of the latter, the complexity of the works involved
together with some of the site difficulties experienced during
construction. The primary objective of obtaining full client
satisfaction was exceeded in a number of various ways in both
these projects.
|